Quality Side / Half Opening Elevator Oilfield Wellhead Equipment Safe Reliable Pipe String Handling factory
<
Quality Side / Half Opening Elevator Oilfield Wellhead Equipment Safe Reliable Pipe String Handling factory
Quality Side / Half Opening Elevator Oilfield Wellhead Equipment Safe Reliable Pipe String Handling factory
>

Side / Half Opening Elevator Oilfield Wellhead Equipment Safe Reliable Pipe String Handling

Brand Name: Factory-owned Brand
Place of Origin: CHINA
Certification: API, ASEM, etc.
Minimum Order Quantity: Depends on the products

Product Details


Length: 2ft~10ft Sealtype: Elastomeric Or Metal-to-metal Seals
Normal Temperature: PU (-29℃~121℃ /-20°F ~250°F) Colour: Red
Productname: Oilfield Wellhead Equipment Material Class: AA, BB, CC, DD, EE, FF
Polished Rod Size: 1", 1 1/8", 1.1/4", 1 1/2" And 1 3/4" Connection: Female, Female; Hammer Union
Highlight

Oilfield Wellhead Equipment Elevator

,

Safe Oilfield Wellhead Equipment

,

Half Opening Wellhead Elevator

Product Description

A wellhead elevator is a critical tool used in drilling and workover operations to directly suspend the pipe string (drill pipe, casing, or tubing) from the hook or traveling block. The elevator connects to the rig’s lifting system via a ring (bail), and different bore diameters accommodate different pipe sizes.

Elevators are classified in two main ways:

By pipe type:

Drill pipe elevator

Casing elevator

Tubing elevator

By structure:

Side-opening double-safety type

Half-opening double-safety type

Locking ring type (less commonly used)

We supply all types and sizes according to customer requirements. Below we focus on the two most popular designs: side-opening and half-opening elevators.



Side-Opening Elevator – Double Safety for Reliable Operation

The side-opening elevator consists of a main body and a side latch (valve) connected by a pin shaft. The side latch opens and closes the elevator assembly.

Automatic locking – When closed, upper and lower locking pins automatically engage with the main body. To open, press the lock pin handle and pull out slightly.

Double safety blocks – Located on the upper end surface of the main body. When the elevator is loaded (pipe string weight applied), the blocks prevent the side latch from opening. Only when the load is removed can the latch be opened. This design greatly reduces the risk of accidental release.

Safety pins – Each elevator includes a pair of safety pins. After the lifting rings (bails) are inserted into the ear holes on both sides, the pins secure the rings and prevent them from coming out during lifting.



Half-Opening Elevator – More Convenient Operation

Compared to the side-opening design, the half-opening elevator is easier and faster to operate. It consists of:

Left and right body halves

Pin locker (locking pin)

Safety handle

Door pin and spring

The rectangular arms on each half are designed to hang the lifting rings. The locking pin joins the two halves into a single solid unit. The safety handle ensures the pin cannot open unintentionally during drilling or lifting operations. This design is preferred when rapid pipe handling is required.



Proper Use & Maintenance

To ensure long service life and safe operation:

Before use – Store in a dry, ventilated area to prevent corrosion and damage.

After use – Remove oil, mud, and other debris. Inspect for damage.

Lubrication – The inner bore and end surfaces should be regularly oiled. Apply rust-preventive oil before storage.

Storage – Keep in a ventilated, dry indoor location.

Cleaning – Aggressive cleaning agents may be used if necessary, but always re-lubricate afterward.



Technical Specifications & Available Sizes

All models are available with rated capacities of 250 tons (2250 kN)350 tons (3150 kN), or 500 tons (4500 kN). The table below shows the elevator aperture, corresponding drill pipe size, and neck outer diameter.

Model

Elevator Aperture (mm)

Drill Pipe Size (in)

Drill Pipe Size (mm)

Neck OD (mm)

DDZ(T)3½EU(101)

100.81

3½ EU

88.90

98.43

DDZ(T)4IU(109)

108.74

4 IU

101.60

106.36

DDZ(T)4EU(121)

121.44

4 EU

101.60

114.30

DDZ(T)4½IU(121)

121.44

4½ IU

114.30

119.06

DDZ(T)4½EU(133)

133.35

4½ EU

114.30

127.00

DDZ(T)5IEU(133)

133.35

5 IEU

127.00

130.18

DDZ(T)5½IEU(148)

147.64

5½ IEU

139.70

144.46

DDZ(T)6⅝IEU(179)

178.59

6⅝ EU

168.28

176.21


Note: “EU” and “IU” refer to thread types (external upset, internal upset). We can supply elevators for other pipe sizes and thread connections upon request.



Why Buy From Us?

Authentic, factory-traceable products – All elevators come from API-certified manufacturers with full documentation.

Competitive pricing – Long-term partnerships mean better prices than many direct channels.

Flexible logistics – We handle export paperwork, freight, and delivery to remote sites.

One-stop sourcing – Combine elevators, cementing heads, slips, and rig components in a single shipment.

After-sales support – Spare parts, warranty follow-up, and technical assistance arranged directly with the factory.

Customized solutions – Need special sizes, thread types, or capacity? We communicate your requirements precisely.



Contact us to order the right wellhead elevator for your drill pipe, casing, or tubing string – with the safety features and capacity you need.

 

Product Highlights

A wellhead elevator is a critical tool used in drilling and workover operations to directly suspend the pipe string (drill pipe, casing, or tubing) from the hook or traveling block. The elevator connects to the rig’s lifting system via a ring (bail), and different bore diameters accommodate ...

Related Products
Quality Continuous Acid Mixing Unit Acid Blending Unit For Fracturing & Stimulation Operations factory

Continuous Acid Mixing Unit Acid Blending Unit For Fracturing & Stimulation Operations

Continuous acid mixing unit for acid fracturing and matrix acidizing. On-demand blending of raw acid, water, and additives. 2,650 gpm (10 m³/min) discharge. Totally enclosed acid mixing system with multiple demisting systems. PTFE and FRP acid-resistant construction.

Quality API 5CT OCTG Oil Tubing Pipe For Oil & Gas Production factory

API 5CT OCTG Oil Tubing Pipe For Oil & Gas Production

Oil tubing pipe is a critical component in oil and gas well completion. After drilling is finished and the well is cased, tubing is run inside the casing to serve as the conduit that transports crude oil and natural gas from the reservoir to the surface. Tubing must withstand the pressures generated ...

Quality Oil Well High Pressure Fracturing Unit High Power Pumping Equipment factory

Oil Well High Pressure Fracturing Unit High Power Pumping Equipment

Fracturing unit (frac pumper) for hydraulic fracturing and well stimulation. 2,000–2,800 hp, up to 20,000 psi, up to 3.85 m³/min. Truck/trailer/skid mount. MTU/CAT/CUMMINS engines, ALLISON/Twin Disc transmissions. Multiple plunger sizes. Intelligent control, remote monitoring.

Quality Truck Mounted Hydration Unit For Fracturing Fluid Preparation factory

Truck Mounted Hydration Unit For Fracturing Fluid Preparation

Hydration unit for hydraulic fracturing fluid preparation. DOTF dry polymer and liquid concentrate systems. 75–100 BPM discharge. Hydration tanks 75–240 bbl. Truck, trailer, or skid mount. Automated control, multiple chemical additives, powder tank 6,600 lb.

Request A Quote

Please use our online inquiry contact form below if you have any questions, our team will get back to you as soon as possible.

You can upload up to 5 files and Each file sized 10M max.