Qualité Skid Mounted Deep Well Drilling Rig 4000m To 9000m With Max Static Loads Up To 6750kN Usine
<
Qualité Skid Mounted Deep Well Drilling Rig 4000m To 9000m With Max Static Loads Up To 6750kN Usine
Qualité Skid Mounted Deep Well Drilling Rig 4000m To 9000m With Max Static Loads Up To 6750kN Usine
>

Skid Mounted Deep Well Drilling Rig 4000m To 9000m With Max Static Loads Up To 6750kN

Nom de la marque: Factory-owned Brand
Lieu d'origine: Chine
Attestation: API, ASEM, etc.
Quantité minimum de commande: dépend des produits

Détails de produit


Mettre en évidence

Skid Mounted Deep Well Drilling Rig

,

Deep Well Drilling Rig 4000m

,

Well Drill Rig 6750kN

Description de produit

Skid-Mounted Drilling Rig – Deep Well Drilling from 4,000m to 9,000m Product Overview Our skid-mounted drilling rig series is designed for deeper drilling operations, covering nominal depths from 4,000 m up to 9,000 m, with maximum static loads ranging from 2,250 kN to 6,750 kN. These rigs are manufactured to meet international standards including API and IEC. The design fully incorporates health, safety, and environmental protection (HSE) principles at every detail. The rigs

Points forts du produit

Skid-Mounted Drilling Rig – Deep Well Drilling from 4,000m to 9,000m Product Overview Our skid-mounted drilling rig series is designed for deeper drilling operations, covering nominal depths from 4,000 m up to 9,000 m, with maximum static loads ranging from 2,250 kN to 6,750 kN. These rigs are ...

Produits connexes
Qualité Continuous Acid Mixing Unit Acid Blending Unit For Fracturing & Stimulation Operations Usine

Continuous Acid Mixing Unit Acid Blending Unit For Fracturing & Stimulation Operations

Unité de mélange d'acide en continu pour la fracturation acide et l'acidification de la matrice. Mélange à la demande d'acide brut, d'eau et d'additifs. Décharge de 2 650 gpm (10 m³/min). Système de mélange d'acide totalement fermé avec plusieurs systèmes de désembuage. Construction résistante aux acides en PTFE et FRP.

Qualité API 5CT OCTG Oil Tubing Pipe For Oil & Gas Production Usine

API 5CT OCTG Oil Tubing Pipe For Oil & Gas Production

Oil tubing pipe is a critical component in oil and gas well completion. After drilling is finished and the well is cased, tubing is run inside the casing to serve as the conduit that transports crude oil and natural gas from the reservoir to the surface. Tubing must withstand the pressures generated ...

Qualité Oil Well High Pressure Fracturing Unit High Power Pumping Equipment Usine

Oil Well High Pressure Fracturing Unit High Power Pumping Equipment

Unité de fracturation (pompe de fracturation) pour la fracturation hydraulique et la stimulation des puits. 2 000 à 2 800 ch, jusqu'à 20 000 psi, jusqu'à 3,85 m³/min. Support pour camion/remorque/dérapage. Moteurs MTU/CAT/CUMMINS, transmissions ALLISON/Twin Disc. Plusieurs tailles de piston. Contrôle intelligent, surveillance à distance.

Qualité Truck Mounted Hydration Unit For Fracturing Fluid Preparation Usine

Truck Mounted Hydration Unit For Fracturing Fluid Preparation

Unité d'hydratation pour la préparation de fluide de fracturation hydraulique. Systèmes de polymères secs et de concentrés liquides DOTF. Décharge de 75 à 100 BPM. Réservoirs d'hydratation 75-240 barils. Support pour camion, remorque ou patin. Contrôle automatisé, additifs chimiques multiples, réservoir de poudre 6 600 lb.

Demandez une citation

Veuillez utiliser notre formulaire de contact en ligne ci-dessous si vous avez des questions, notre équipe vous contactera dès que possible.

Vous pouvez télécharger jusqu'à 5 fichiers et chaque fichier de 10M de taille max.